Orlando Residential and Commercial Roof Installation

New Construction Roofing in Orlando, FL

Revildor® works with homeowners, builders, and general contractors to install complete roofing systems for new homes, additions, and commercial projects throughout Orlando and Central Florida, coordinating every phase from plan review and dry-in through final installation and inspection.

Plan and Spec Review Dry-In and Waterproofing Shingle, Tile, and Metal Builder Coordination
Professional Roof Inspections
BBB Accredited A+ Contractor
Licensed: CCC1328368 | CGC1508771
Serving Central Florida Since 2007

SCHEDULE YOUR CONSULTATION

Contact Us

Revildor BBB Accredited A Plus roofing contractor in Orlando Florida Revildor CertainTeed ShingleMaster Pro roofing contractor Florida Roofing and Sheet Metal Contractors Association member Revildor
Florida DBPR licensed roofing contractor Revildor
Revildor recognized roofing company in Orlando Florida
18+ Years Serving Central Florida Homeowners
Quick Answer

What does new construction roofing include?

New construction roofing includes the planning, material selection, dry-in, flashing, ventilation, installation, inspections, and coordination required to build the roof system correctly from the start. Revildor works with homeowners, builders, developers, and general contractors on new roofing projects in Orlando and Central Florida. The goal is not simply to cover the structure. It is to deliver a complete roof assembly that fits the plans, meets local requirements, manages water correctly, and performs in Florida weather.

Built Correctly From Day One

What a new construction roof needs to get right.

New construction removes the excuse of inheriting someone else’s bad roof. The plans, materials, sequencing, and installation details need to work together before Florida weather gets a chance to test them.

1

Plan & Scope Review

Roof plans, slopes, transitions, penetrations, materials, drainage, ventilation, and project requirements should be reviewed before installation begins—not argued about after the deck is covered.

2

Correct Roof System

Shingle, metal, tile, and low-slope systems have different structural, underlayment, flashing, attachment, and maintenance requirements. The material must fit the design and building use.

3

Reliable Dry-In

The dry-in protects the roof deck before the finished material is installed and becomes part of the long-term water-management strategy. Rushed dry-in work can create problems that stay hidden for years.

4

Flashing & Transitions

Valleys, walls, roof-to-wall connections, curbs, chimneys, skylights, vents, and changes in slope need deliberate details. These are roof-system components, not last-minute accessories.

5

Ventilation & Heat Control

Ventilation must work with the building design and roof assembly. Poor airflow can increase attic heat, trap moisture, and shorten the service life of roofing materials.

6

Trade Coordination

Roofing intersects with framing, masonry, HVAC, electrical, plumbing, gutters, solar, and exterior finishes. Coordination keeps later trades from creating avoidable holes, delays, and leaks.

Residential & Commercial Projects

New roofing built around the actual project.

A custom home, production home, commercial building, addition, detached garage, and mixed-slope property do not need the same roofing plan. The system must match the structure, architectural intent, roof geometry, occupancy, schedule, energy goals, and long-term maintenance needs.

Revildor reviews the project requirements early, identifies roofing-specific concerns, and coordinates the installation around the construction schedule. That helps reduce rework, inspection problems, and the usual circus created when roofing decisions are left until the last minute.

Project Coordination

A strong roof starts before installation day.

  • Roof plans and specifications are reviewed early
  • Material lead times are considered in the schedule
  • Dry-in timing is coordinated with framing progress
  • Penetrations and roof-mounted equipment are identified
  • Inspections and documentation are planned
  • Other trades know how to protect completed roof work
Roofing Systems

New construction roofing options in Orlando.

Roof material should support the architecture, structure, budget, neighborhood, energy goals, expected maintenance, and Florida weather exposure. The finished look matters, but the concealed assembly has to work first.

Asphalt shingle new construction roofing icon

Asphalt Shingle Roofing

Asphalt shingles offer broad design options, efficient installation, and dependable protection for many new homes. Underlayment, starter, flashing, ventilation, and manufacturer requirements still decide the result.

Metal new construction roofing icon

Metal Roofing

Metal roofing can deliver clean architectural lines, durability, and energy-performance benefits. Panel selection, clips or fasteners, expansion, trim, valleys, penetrations, and substrate design must work as one system.

Tile new construction roofing icon

Tile Roofing

Tile roofing gives new construction a distinctive Florida appearance and long-term curb appeal. Structural loading, underlayment, fastening, flashing, ventilation, and breakage control must be addressed from the plans forward.

Our Process

How Revildor handles new construction roofing.

New construction roofing depends on timing, documentation, communication, and disciplined installation. Revildor keeps the roofing scope clear from preconstruction review through final inspection and closeout.

1

Preconstruction Review

Plans, specifications, roof geometry, material selections, drainage, penetrations, ventilation, access, scheduling, and project responsibilities are reviewed before field work begins.

2

Scope & Material Planning

The roof system, underlayment, flashing components, accessories, lead times, inspection requirements, and installation sequence are aligned with the project.

3

Dry-In & Weather Protection

The roof deck is reviewed, preparation is completed, and the dry-in is installed to protect the structure and establish the foundation for the finished system.

4

Roofing Installation

Roofing materials, flashing, valleys, vents, penetrations, edges, transitions, and accessories are installed in accordance with the selected system and project requirements.

5

Inspection & Coordination

Required inspections are supported, outstanding details are addressed, and completed roof work is coordinated with the builder and any trades that follow.

6

Closeout & Final Review

The finished system is reviewed, the project area is cleaned, roof-related closeout items are completed, and the owner or contractor receives a clear handoff.

Florida Weather

New Orlando roofs need Florida-ready details.

A new roof in Orlando must be prepared for intense sun, heat, humidity, heavy rain, wind-driven water, tropical systems, and storm debris from its first season forward. Material choice matters, but water management and attachment details matter just as much.

The design and installation should account for roof pitch, drainage paths, wind exposure, wall transitions, valleys, ventilation, penetrations, and how future equipment or solar work could affect the assembly. Building it correctly now is cheaper than diagnosing hidden mistakes later.

Important new construction roofing details:

  • Roof deck condition, fastening, and readiness
  • Underlayment and temporary dry-in protection
  • Valley, wall, edge, and transition flashing
  • Pipes, vents, skylights, curbs, and penetrations
  • Balanced ventilation and attic heat management
  • Wind-rated attachment and manufacturer requirements
  • Inspections, cleanup, documentation, and closeout
Builder & Owner Coordination

Roofing that stays aligned with the build.

Roofing cannot operate in a vacuum on a construction site. Framing progress, masonry, exterior finishes, mechanical equipment, plumbing vents, electrical work, gutters, solar planning, and inspections all affect the roof schedule and final details.

What Revildor coordinates

Clear coordination helps protect the dry-in, prevent trade damage, reduce failed inspections, and keep roof penetrations and transitions from becoming last-minute field decisions.

  • Deck readiness and dry-in scheduling
  • Wall, curb, vent, and penetration locations
  • Material delivery and installation sequencing
  • Inspection, punch-list, and closeout requirements

Why early involvement matters

Bringing the roofing contractor into the project early gives the team time to catch incompatible details, confirm material availability, clarify responsibilities, and solve roof-related conflicts before they create delays or change orders.

Local Service Area

New construction roofing in Orlando and Central Florida.

Revildor provides new construction roofing for homeowners, builders, developers, and general contractors across Orlando and nearby Central Florida communities. Local experience matters when plans, product approvals, inspections, weather exposure, and construction schedules all have to stay aligned.

Orlando Winter Park Altamonte Springs Apopka Sanford Lake Mary Oviedo Ocoee Winter Garden Windermere Maitland Central Florida