Do you repair commercial roofs or only replace them?
Revildor evaluates commercial roof repair and replacement needs. A localized failure may support repair when the surrounding assembly is serviceable. Broader deterioration, recurring issues, or underlying damage may justify additional investigation and a replacement discussion.
What commercial roof systems do you work with?
Revildor provides services involving low-slope systems, including TPO and modified bitumen, as well as metal and other roofing materials where appropriate. The actual assembly and building requirements determine the scope and recommended approach.
Can our business stay open during roofing work?
That depends on the work, access, occupied areas, and building operations. Discuss noise, deliveries, entrances, interior protection, and sensitive activities before scheduling. The project plan should address those needs and identify any necessary restrictions.
Can a roof coating postpone replacement?
A compatible restoration system may be considered for a suitable roof after its condition is evaluated. It cannot substitute for addressing wet materials, unstable attachment, or unresolved drainage. Ask what assessment and preparation support the recommendation.
Should rooftop equipment be included in the planning?
Yes. Equipment curbs, supports, penetrations, and service access affect the roof. Some water-entry problems may also involve equipment or other trades. Identify the responsible parties and coordinate any relocation, flashing, or related work before the project starts.
How can we prepare for a commercial roof evaluation?
Gather roof plans if available, past proposals, warranties, repair history, leak logs, and equipment information. Share access restrictions and occupied areas affected by leaks. These records help connect current findings with the roof’s service history.
Does a recover avoid the need to assess the old roof?
No. Retaining an existing assembly requires a project-specific evaluation of moisture, layers, attachment, substrate condition, compatibility, and applicable requirements. A new surface should not conceal unresolved failures that compromise the proposed system.
What should we keep after the roofing project?
Retain the contract, approved changes, relevant photos and inspection records, product information, applicable warranty documents, and maintenance guidance. Keep a log of later roof access and repairs so future evaluations have an accurate service history.