New Homes • Additions • Commercial Projects

New Construction Roofing in Central Florida

Revildor® works with Central Florida owners, builders, and general contractors on roofing for new homes, additions, and commercial construction. We coordinate roofing scope, material selection, dry-in, installation, and the details that connect the roof to the building.

Plan and Scope Review Dry-In Coordination Shingle, Metal, and Tile Low-Slope Roof Systems
Builder and Owner Coordination
BBB Accredited A+ Contractor
Licensed: CCC1328368 | CGC1508771
Serving Central Florida Since 2007

SCHEDULE YOUR CONSULTATION

Contact Us

Revildor BBB Accredited A Plus roofing contractor in Orlando Florida Revildor CertainTeed ShingleMaster Pro roofing contractor Florida Roofing and Sheet Metal Contractors Association member Revildor
Florida DBPR licensed roofing contractor Revildor
Revildor recognized roofing company in Orlando Florida
18+ Years Serving Central Florida Homeowners
Quick answer

When should roofing be planned for new construction?

Roofing should be coordinated while plans, material choices, and construction sequencing are being developed. Roof slope, structural design, drainage, penetrations, wall connections, and attic assembly affect the roofing specification. Leaving those decisions until the deck is ready can create avoidable revisions and delays.

Revildor reviews the roofing scope with the project team so materials, responsibilities, access, and installation timing can be addressed early. A new roof needs more than a finish selection: it needs a complete assembly that fits the building design and the other trades working around it.

Build the details into the plan

A strong installation starts before dry-in.

New construction gives the project team an opportunity to coordinate roof details before they become concealed. The roofing scope should identify important connections and the sequence needed to complete them correctly.

Plans and system selection

Roof geometry, architectural intent, structural design, and material requirements need to agree. A low-slope addition, a tile roof, and a standing seam roof cannot share an unspecified generic assembly. Clarify the selected systems and their transitions.

Deck readiness and dry-in

The roof deck and required preparation must be ready before the next layers are installed. Dry-in timing should account for weather, construction progress, and the selected underlayment. Temporary exposure limits depend on the product and site conditions.

Coordination with other trades

Plumbing, HVAC, electrical work, masonry, cladding, and other trades can affect roof penetrations and flashings. Identify who installs each component and when. Later alterations need a plan so completed waterproofing is not compromised by uncoordinated work.

Understand your options

Different projects need different roofing coordination.

The construction schedule should reflect the roof assembly and the building use. Confirm responsibilities at the transitions between roofing and the rest of the project.

Option or condition When it matters What to confirm
New homes Coordinate appearance, attic design, roof geometry, and finish selections. Confirm materials, penetrations, framing readiness, and roof-to-wall details before installation.
Additions and accessory buildings Connect the new roof to the existing building where applicable. Review slope changes, tie-ins, drainage, and the condition of retained roof areas.
Commercial construction Integrate drainage, curbs, equipment, access, and the specified roof assembly. Coordinate submittals, trade responsibilities, inspections, and closeout expectations.
Before requesting a quote

Share the details that shape a reliable roofing scope.

A roofing estimate is more useful when the plans and responsibilities are clear. If a selection is still open, identify it as a decision to be resolved so the proposal does not silently rely on a different assumption.

  • Current roof plans, elevations, and relevant specifications
  • Preferred material, color, profile, and project budget priorities
  • Target framing, deck readiness, and dry-in milestones
  • Locations of roof equipment, vents, skylights, and other penetrations
  • Access, staging, inspection, and coordination requirements
What matters

Dry-in is a milestone, not the completed roof.

The underlayment stage is part of the weather-protection strategy, but it is not the final assembly. Exposure limits, unfinished transitions, and work by other trades need ongoing coordination. The schedule should account for completing the covering and details within the selected system’s requirements.

New roof systems

Choose the material with the supporting design.

Revildor discusses roofing options in relation to the plans. Appearance, structure, drainage, ventilation or unvented assembly design, maintenance, and budget should be considered together before the material package is finalized.

Asphalt shingle roofing

For suitable slopes, a shingle system coordinates deck preparation, underlayment, starter, flashing, ridge components, and the attic design. Product choices should be confirmed with colors, accessory requirements, and applicable coverage expectations.

Metal and tile roofing

Metal planning includes panel layout, attachment, movement, and flashing details. Tile planning includes structural suitability, loading, underlayment, and fastening. Both need careful coordination with valleys, walls, penetrations, and the building’s architectural intent.

Low-slope roof assemblies

Membrane selection needs to work with slope, insulation where specified, drainage, curbs, and perimeter details. Connections to adjacent steep roofs or taller walls should be resolved as part of the design rather than improvised during installation.

Scope and budget

What affects a new construction roofing estimate?

A price based on incomplete plans can hide major assumptions. A useful proposal identifies the system, quantities, responsibilities, and open decisions so changes can be discussed before they reach the roof.

Project factor How it affects the scope
Design and geometry Roof area, slopes, valleys, height, and transitions shape material and labor needs.
Material specification Covering, underlayment, insulation, flashing, and accessories define the assembly.
Coordination scope Equipment curbs, penetrations, specialty details, and inspection responsibilities affect work.
Schedule and access Phasing, deliveries, staging, lead times, and readiness influence installation planning.
The Revildor process

From the first conversation to the next step.

Your project should have a defined purpose, an understandable scope, and clear communication about the work ahead.

Review plans and responsibilities

Discuss the latest documents, selected systems, trade interfaces, and schedule. Identify open questions about drainage, penetrations, deck conditions, and details before the scope is finalized.

Coordinate materials and dry-in

Align product availability, deliveries, access, deck readiness, and weather protection with construction progress. Confirm what must be complete before roofing begins and how later trades will protect installed work.

Install and close out

Complete the agreed roof system and coordinate remaining details with the project team. Review the completed scope, relevant inspection and product documentation, warranty information, and handover expectations.

Orlando based • Central Florida focused

New Construction Roofing across Central Florida.

Revildor supports roofing plans for new construction across Central Florida, including Orlando-area homes, additions in established communities, and commercial projects. Share the project location and current plan set so the roofing scope can be coordinated with the actual site and schedule.

Orlando Clermont Kissimmee Lake Mary Longwood Maitland Oviedo Sanford Winter Garden Winter Park Winter Springs Windermere Altamonte Springs Apopka Ocoee Casselberry

Revildor® • Serving Central Florida since 2007
(321) 332-3392 • Licenses: CCC1328368 | CGC1508771

Roofing Contractor in Central Florida →

New Construction Roofing FAQs

Questions about new construction roofing in Central Florida.

Straight answers to help you understand the service and prepare for a useful roofing conversation.

Do you work directly with builders and general contractors?

Yes. Revildor works with owners, builders, and general contractors on new roofing projects. Early discussion should establish the plan set, roofing system, schedule, trade responsibilities, and documentation needed for the project.

Can you quote a roof from plans?

Plans can support an initial scope and estimate when they contain the relevant dimensions and details. Material selections, responsibilities, access, and site conditions still need confirmation. Identify any unfinished decisions so the proposal’s assumptions remain clear.

What does roof dry-in mean?

Dry-in is a construction stage involving the specified underlayment and related temporary weather-protection details. It is not the same as a completed roof. Product exposure limits and unfinished transitions need to be considered in the construction schedule.

Can an addition use a different material from the main roof?

Yes, when the design and selected systems support that approach. An addition may have a lower slope requiring a different assembly. The tie-in, flashing, and drainage between the new and existing roof need a coordinated detail.

When should roof penetrations be planned?

As early as practical. Plumbing vents, HVAC equipment, skylights, and other openings affect layout and flashing. Coordinating locations and responsibilities before installation can reduce later changes that disturb completed roof work.

Can we select tile after the framing is designed?

The proposed tile system must be checked against the structural design and other project requirements. Do not assume a material change is cosmetic. Resolve loading, roof geometry, and attachment requirements before committing to the new selection.

Who handles permits and inspections?

The project agreement should clearly assign those responsibilities between the owner, builder, general contractor, and roofing contractor. Requirements depend on the project and local authority. Confirm the process and documentation before work starts.

What should be included in roofing closeout?

Discuss the expected completion review, product information, applicable warranty documents, relevant inspection records, and care instructions. The exact package should follow the project agreement and any builder or owner documentation requirements.

Do It The R.E.V.I.L.D.O.R. Way

Let’s talk about your new construction roofing project.

Bring the roof into the construction conversation early. Revildor helps Central Florida project teams coordinate materials, details, and installation around the building plans and the work happening on site.